Stormwater Management Plans & Reports in Raleigh, NC & the Triangle

Sealed stormwater reports, drainage calculations and SCM design for site plans, subdivisions and commercial projects — prepared by a NC licensed civil engineer and carried through permit approval. We work directly for developers and builders, and as the civil engineer on architect-led teams.

Get a Quote(919) 744-1140
Got a plan review comment asking for a stormwater management plan, drainage calculations or a downstream impact analysis? We prepare the stormwater engineering your site plan, subdivision or grading permit needs — and coordinate it with the grading, utility and erosion control plans so the whole submittal moves together.

Stormwater Engineering Services

Every project is designed to the local stormwater ordinance (Raleigh UDO, Cary LDO, Holly Springs UDO, Wake County and others) and the NCDEQ Stormwater Design Manual.

Stormwater Reports & Calculations

  • Pre- vs. post-development hydrology
  • Peak flow control for the 1-, 2-, 10- & 100-year storms
  • Drainage area maps & time of concentration
  • Storm drain pipe & inlet sizing

SCM / BMP Design

  • Wet ponds & detention basins
  • Bioretention & rain gardens
  • Underground detention & sand filters
  • Outlet structures, riser & spillway design

Nutrient & Water Quality

  • Neuse, Falls Lake & Jordan Lake nitrogen and phosphorus loading
  • Nutrient offset payment calculations
  • Riparian buffer coordination
  • Impervious (built-upon area) tracking

Downstream Impact Analysis

  • Downstream drainage & capacity analysis
  • Flood study & FEMA floodplain coordination
  • Culvert & channel analysis

Permitting

  • Town, City & County stormwater permits
  • NCDEQ State Stormwater permits
  • NCG01 construction stormwater & erosion control
  • Response to plan review comments

Closeout

  • Operation & maintenance (O&M) agreements
  • SCM as-built review
  • Engineer's certification for final approval / CO

For Architects

Need a civil engineer for site plan approval? We join your design team as the civil sub-consultant — site layout, grading and drainage, utilities, erosion control and the stormwater management plan — and coordinate building footprint, finished floor elevations, roof drains and utility entries with your drawings. One point of contact, sealed civil sheets, and quick turnaround on review comments.

For Developers & Builders

From feasibility to permit: we check stormwater requirements during due diligence so SCM size and cost are known before you close, then design the most space-efficient solution to protect lot yield. Stormwater is usually paired with our mass grading plans, subdivision and preliminary plat work and commercial site plans.

How It Works

Send the Project

Address, survey, site or architectural plans, and any review comments you have.

Requirements & Proposal

We confirm what the jurisdiction requires and send a clear scope and fee.

Design & Sealed Report

Calculations, SCM design and plan sheets sealed by a NC licensed P.E.

Review to Approval

We answer review comments and coordinate with staff through approval and closeout.

Recent Stormwater Work

Lower Hopedale Townhomes

Burlington, NC — 55-unit townhome community. Stormwater management design and permit; stormwater permit issued.

Clayton Pawville

Clayton, NC — Pet kennel & veterinary site. Wet pond SCM design with construction drawings approved by the Town of Clayton.

Forestville Road & Mineral Springs

Wake Forest & Durham, NC — Stormwater impact analyses for 62-unit and 11-lot subdivisions.

See all projects →

Common Questions

When is a stormwater management plan required?Most North Carolina towns require stormwater management when a project adds impervious surface or disturbs land above a set threshold — for example a commercial site plan, subdivision, or a lot that exceeds its allowed impervious coverage. Thresholds differ between Raleigh, Cary, Apex, Holly Springs, Wake County and others, so we confirm the requirement for your parcel before design starts.
What is the difference between a stormwater report and a stormwater plan?The stormwater report holds the engineering calculations — drainage areas, pre- and post-development runoff, detention routing and nutrient loading. The stormwater plan sheets show the SCMs, pipes, grading and details that will be built. Most permits require both, sealed by a NC Professional Engineer.
Do I need detention for a small commercial or infill site?Often, yes. Many jurisdictions require post-development peak flows to be held to pre-development rates for the 2-year and 10-year storms, or a downstream impact analysis showing no adverse effect. Underground detention or a small bioretention area can usually fit on tight sites.
What are nitrogen and phosphorus requirements?Projects in the Neuse River, Falls Lake and Jordan Lake watersheds must meet nutrient export limits. We calculate nitrogen and phosphorus loading and show compliance with on-site SCMs, an offset payment where allowed, or a combination.
I am an architect. Can you be the civil engineer on our team?Yes. We work as the civil sub-consultant on architect-led projects — site plan, grading, utilities, erosion control and the stormwater report — and coordinate building footprint, finished floor elevations, roof drains and utility entries with your drawings.
What happens after construction?Most permits require an operation and maintenance agreement, as-built survey of the SCM and an engineer's certification before final approval or certificate of occupancy. We prepare the certification and help close out the permit.

Service area: Raleigh, Cary, Apex, Holly Springs, Fuquay-Varina, Garner, Wake Forest, Knightdale, Morrisville, Durham, Chapel Hill, Clayton, Johnston County, Chatham County and communities across North Carolina.

Need a stormwater report for your site plan?

Send us the address and your plans or review comments for a quick scope and fee.

Request a Quote(919) 744-1140