Mass Grading & Land Disturbance Permit Plans in Raleigh & the Triangle
Need a permit just to clear your lot? We prepare sealed mass grading and erosion control plan sets for builders, land-clearing contractors and property owners — and handle the City's review comments through approval.
Get a Quote(919) 744-1140
Do I need a permit to clear my lot? In the City of Raleigh, clearing, grubbing or grading 12,000 square feet or more (about 0.28 acre) requires a land disturbance permit and a sealed plan set — even if you are not building yet. Disturbing 1 acre or more also requires NCDEQ construction stormwater (NCG01) coverage. Other Triangle towns and counties have similar thresholds.
What's Included
Cover Sheet
- Project data, disturbed area & vicinity map
- City TCPED & right-of-way notes
- Case number & sheet index
Clearing & Erosion Control Plan
- Limits of disturbance
- Silt fence, construction entrance & inlet protection
- Ground stabilization & construction sequence
Grading & Details
- Rough grading & drainage (when proposed)
- Tree protection & City street-tree requirements
- City & NCDEQ standard details
How It Works
Send Your Survey
Send the address and your boundary/topo survey. We confirm scope and thresholds.
Flat-Fee Proposal
Clear scope and a flat fee — typically within 24 hours.
Sealed Plan Set
Plans prepared and sealed by a NC licensed P.E., ready to upload to the permit portal.
City Comments
We respond to review comments and coordinate with staff through approval.
Who We Help
Home Builders
Clear and prep lots before house plans are final.
Clearing & Grading Contractors
Get the permit your client needs so your crew can start.
Property Owners & Developers
Mass grading for infill lots, subdivisions and commercial sites.
Common Questions
Do I need house plans before I can clear the lot?
No. A mass grading (grading-only) permit can cover clearing, grubbing and erosion control without a building. Driveways, buildings, walls and utilities are permitted later with the site or building permit.
What is the Financial Responsibility / Ownership form?
A City form signed by the property owner identifying who is responsible for erosion control. The disturbed area on the form must match the plans exactly.
Is a surety or bond required?
Raleigh may require an erosion control surety before the permit is issued. We'll let you know early so it doesn't delay your start.
What about trees in the right-of-way?
City street trees near the work area must be protected or replaced (or a fee-in-lieu paid). We show tree protection and critical root zones on the plans to avoid review delays.
How long does it take?
Plans are typically ready within a week of receiving the survey. City review times vary — we respond to comments quickly to keep things moving.